New with Spring greenery (2015 03 03) |
Unlocks at Level 38
Related Task:
Metal is forged in it.
Cost: 1,134,000
Manufacturing Slots: 3
Building Steps: 4
Step | Time | Reward | ||
---|---|---|---|---|
1 | 24 Brick 6 Gear 7 Metal Sheet 45 Pipes |
15:00:00 | 1,400 14,000 |
|
2 | 50 Water 28 Fire 40 Crushed Stone 24 Cement |
15:00:00 | 1,600 16,000 |
|
3 | 1 Transformer 2 Wire 18 Nickel 36 Resin |
18:00:00 | 1,600 16,000 |
|
4 | 7 Wrench 18 Gear 28 Crude Oil 26 Rivet |
14:00:00 | 2,900 29,000 |
Result | Time | |||
---|---|---|---|---|
Pipes | 10 Scrap Metal 5 |
15:00 | ||
Fittings | 5 Pressed Metal 2 Gear |
45:00 | ||
Foil | 2 Metal Sheet 2 Silver |
30:00 | ||
Spring | 1 Fittings 3 Gear 10 |
1:40:00 | ||
Steel Beam | 28 Pressed Metal 10 Fire |
2:00:00 | ||
Chisel | 1 Grindstone 1 Fittings |
10:00 | ||
Cutter | 1 Metal Sheet 1 Sandpaper |
10:00 |
Task | Taskline | |
---|---|---|
Metal is forged in it. | Buy Blast Furnace. Build Blast Furnace. |
Old Tree |
Preheat furnace | Make 5 Spring Make 2 Foil |
Old Tree |
3 stage of the technologies introduction | Make 6 Fittings | Old Tree |
4 stage of the technologies introduction | Make 5 Spring | Old Tree |
5 stage of the technologies introduction | Make 12 Foil | Old Tree |
Where do pipes disappear? | Make 20 Pipes | To the New Lands |
Hot Blast furnace | Make 10 Spring Make 22 Fittings |
To the New Lands |
Stockings | Make 32 Chisel | To the New Lands |
Unordinary rock | Make 36 Cutter | To the New Lands |
Solid debris | Make 10 Steel Beam | To the New Lands |